CBM 1100 PRO 빠른 시작 매뉴얼

{카테고리_이름} CBM 1100 PRO에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CBM 1100 PRO 4 페이지.

Back-UPS (VA):
Back-UPS PRO (VA):
STEP 1:
Connect the UPS's Internal batteries (Figure 1):
NOTE: Battery Disconnect/Connector may vary or be
omitted on some models. Figure 1 illustrates some of the
variations in connectors. Please follow the illustration
which best resembles your UPS.
Procedure for Figure 1: (1, 2)
1.1 Remove the two screws holding the battery door.
1.2 Lay the UPS on its side and open the door
1.3 Gently pull the battery out.
1.4 Connect the two wires to the battery
NOTE: Make sure to observe the polarity (Red-to-Red, Black-to-Black)
NOTE: Small sparks at the battery connections are normal.
1.5 Insert the battery in the UPS. Carefully avoid pinching the wires.
1.6 Close the battery compartment door and replace the screws.
Procedure for Figure 1: (A)
1.1 Locate the 'Battery Disconnect' on the rear panel of the UPS. It is typically
a Yellow connector.
1.2 If the Battery Disconnect has a metal cover, remove the fastening screws
and move the cover
A
1.3 Press the yellow connector into the Battery Jack. A snap will be felt as the
connector partially engages the jack. A second snap will be felt as the
connector securely seats in the Battery Jack.
STEP 2:
Connect wiring & charge UPS (Figure 2):
NOTE: Ensure equipment is turned off.
2.1 Connect equipment to UPS
2.2 Connect UPS Power Cord to a suitable power receptacle
2.3 Reset the UPS Circuit Breaker by pushing-in the button
(Circuit breakers may differ on some models)
2.4 Power-up the UPS by pressing the
Switch.
2.5 Wait for the Self-Test to complete, then Power-up equipment.
2.6 Allow UPS to charge batteries for 24 hours prior to operating
on battery or performing additional Self-Test or Calibration
tests.
C B M _ O T Q G _ B U 3 _ 2 0 1 1 0 8 0 9 V 0 2
250, 280, 300, 400, 420, 450, 500, 600, 650
650, 1000, 1100, 1400
1
2
OR
1
2
3
button or
1
OR
1
1
2
A
Figure 1
2
3
Figure 2
Page 1