Datapath VSN Series 빠른 시작 매뉴얼 - 페이지 6
{카테고리_이름} Datapath VSN Series에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Datapath VSN Series 20 페이지. Wall controller
Datapath VSN Series에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (20 페이지), 빠른 시작 매뉴얼 (20 페이지)
STEP 6 POWERING UP THE SYSTEM
VSN wall controllers are supplied with either a Redundant Power Supply Unit (RPSU)
or an ATX power supply. An RPSU power supply requires two power cables and an
ATX supply requires one power cable. All power cables are supplied with your VSN
wall controller.
1. Connect power cable(s) to the VSN wall controller then plug into a mains supply.
2. Switch on the power supply units.
RPSU Power Switch
3. Switch on the system using the power button on the front panel.
Note:
If you have a VSN Expansion Chassis connected to the main unit (Step 2), the power
supply units on the expansion chassis should be switched on prior to the main VSN
wall controller. There is no requirement to switch on the expansion chassis on the
front panel (3).
Page 6
1
2
ATX Power Switch
1
2
3