DV Systems A5 (T) 설치 및 서비스 매뉴얼 - 페이지 2

{카테고리_이름} DV Systems A5 (T)에 대한 설치 및 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DV Systems A5 (T) 19 페이지. Rotary screw

DV Systems A5 (T) 설치 및 서비스 매뉴얼

Mechanical Installation.

(Refer to Page 6)
The Unit should be located in a dry, clean, cool,
dust free, and well ventilated area.
Allow a minimum 18" (458mm) around and 36"
(915mm) above Unit.
The ambient temperature should be between
10° C and 40° C (50° F and 104° F).
Ensure that the floor under the Unit is smooth,
level and capable of bearing the weight of the
Compressor.
If installed in a compressor room, ensure that the
room is adequately ventilated
Lubrication.
(Refer to Page 8)
Ensure the oil level in the Air End is between the
top (maximum) or bottom (minimum) thread as
shown.

Quick Start

18"
[458mm]
Drain condensate (water) from oil tank.
If compressor work-cycle experiences long
pauses, condensate will gather in oil tank.
Drain condensate EVERY 50HRS OR WEEKLY.
(Refer to Page 8 for details)
Rotation.
(Refer to Page 10)
The correct rotation is as shown.
The Unit is equipped with an Anti-Rotation
Switch. Check that the rotation is correct.
- 2 -
A5-C
Sep '15
36"
[915mm]
18"
[458mm]
18"
[458mm]
Installation Kit
IK515
Flex-Hose &
Vibration Isolators
(sold separately)