Australian Railway Kits NSWGR D57 사용 설명서 - 페이지 6
{카테고리_이름} Australian Railway Kits NSWGR D57에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Australian Railway Kits NSWGR D57 18 페이지. 4-8-2 locomotive and tender kit
Add frame support plates (137x2) to the rear of the chassis followed by bogie support bracket (156), then add the mechanical
stoker (155).
Assemble the gearbox (214) as per the accompanying instructions trimming the worm shaft as shown. Do not force the worm
onto the shaft. Carefully ream the worm bore using a 2.Omm drill or hand reamer so that the worm fits the shaft without
undue force. Use a spot of superglue of Loctite 601 to permanently fix in place. Clean the shaft of excess glue or Loctite
thoroughly.
Trim the flexible tube (213) to length as shown and fit to the worm shaft of the gearbox - check that the ends of the worm
shaft and motor shaft are free of sharp edges with could damage the tubing. Fit the tubing to the motor and fit the gearbox
onto the axle gear. Fit the gearbox keeper plate (215) using screws (216x2). Oil the mechanism and apply power to test the
chassis.
,
Complete detailing the front pilot deck with handrail post (192) and footplate inserts (193x2). Fold front step (190) as shown
and add front step tread (191) before fitting to the buffer beam. Fix guard irons (189xpair) in place and add brake hose (187)
and buffers (188x2), finally add lamp brackets (186x4).
Bogies Drawing 6 (Parts 223 - 231)
Make up the rear pony truck using rear pony body (223),12mm disc bogie wheel (224) and keeper plate (225). Attach the
assembled bogie to the chassis using M2 nut (231). Makeup the front bogie using front bogie body (226), 9mm spoked bogie
wheels (227x2) and keeper plates (228x2) - ensure that the insulated wheels are on the same side. Attach the assembled bogie
to the chassis using spring (221), bogie bearing washers (222) and (229), and M2 nut (230), with the insulated wheels on the
R/H side.
Locomotive Body Drawings 1, 2 and 3 (Parts 47 - 128)
Remove the cab (47) from the etch and fold as per Drawing 3, folding also the small locating tabs at the bottom front of the
cab. Take the window frames (50x2) and fix to the inside of the cab windows. Fix the mechanical stoker detail (49) to the rear
spectacle plate (48) before fixing the spectacle plate to the cab. Take the boiler (51) and smokebox (53) and drill all holes as
indicated in Drawings 3 and 4. Remove pump mounting plate (55) from the etch, fold as per Drawing 3 and fix to the
smokebox (53). Remove the saddle seating plate (54) from the etch, fold down one end as shown and fix to the underside of
the smokebox (53). Now fix the smokebox (53) to the boiler (51) ensuring that they are correctly aligned. Fix the ash pans
(68xpair) either side of the firebox. Fit the assembled cab to the rear of the boiler and fix in place.
Fix the air tank (106) to the L/H side of the boiler. Fix firebox supports (63x2) either side of the firebox, and fix centre support
(64) to the R/H side of the boiler. Fix leading support (65x2) either side of the boiler.
Remove the footplates (66xpair) from the fret, note the L/H side has a large cutout to clear the air tank (106). Take the valance
strips (67x2) and solder them to the underside of the footplates (66xpair) O.5mm in from the outside edge.
Note that the front of the valance strips must be set back from the front of the footplates to clear the footplate inserts (193x2)
previously fitted to the front footplate (183).
Locate the tab on the rear of the footplate into the slot in the cab front and position the front of the footplate under the blast
pipe spigot either side of the smokebox (53). Check the alignment before fixing in place. Add footplate access panels (87x2)
to the top of the footplates. On the R/H side footplate add air tanks (85x2) and small air tank (82). Note that the etched lines
on the underside of the footplate indicate their location. Fix the cab step plates (6lxpair) at the rear of the footplates before
adding cab step detail plates (62xpair).
Fix the short handrail knobs (98x6) to the front of the cab followed by junction box (69). Using 0.4mm wire, make up and fit
handrails to the cab front. Commence detailing the boiler/firebox, fitting chimney (59), adding three 0.4mm handrails to the
sandbox as shown, steam dome (58) safety valves (57), steam turret (56), R/H turret valve (86), and L/H turret valve (115),
steam generator (70), boiler safety valve (71), clack valves (72) and (105), and whistle (104).
Fix in place R/H marker lamp (79) and L/H marker lamp (107) before fitting smokebox door (60). Drill all required holes in
the smoke box door and fit the short handrail knobs (94x4), (95x2) and (96x3), headlight (73), smoke box door handle (74).
Fold step treads (75x2) and fix in place. Fit the air pump (78) - because of its vulnerability, it is recommended that the air
pump filter (76) be fitted later.
At this stage it is recommended that the heaver pipe work (0.7mm wire) be fitted before the remainder of the small detailing
parts.
Page 6