AUSTRAMAC FLASHCUT 1400 RM 운영자 매뉴얼 - 페이지 7

{카테고리_이름} AUSTRAMAC FLASHCUT 1400 RM에 대한 운영자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. AUSTRAMAC FLASHCUT 1400 RM 14 페이지. Diamond rock saw

Installation and commissioning guidelines:
1.
Connect rock saw to excavator with quick hitch or manually secure
pin. Operator to ensure that:
a. Quick hitch (or pins) matches the rock saw pick up.
b. Pin is always securely inserted in quick hitch.
c. All debris is removed from attachment points.
d. The pickup devices are securely attached to the saw.
e. All operators must be educated on connection procedure at
handover.
f.
Head bracket bolts are tight.
2.
Connect Hydraulic hoses. Operators to ensure:
a. All operators must be educated on connection procedure at
handover.
b. Connections are tight and are not cross threaded.
c. Appropriate hose and connectors are used.
d. Pressure limiting device is installed.
e. Maximum pressure and flow rates do not exceed levels
indicated on identification badge.
f.
Hoses are kept clear of blade at all times.
3.
Connect water hose. Operators to:
a. Ensure water hose is connected for every cut.
b. Ensure that flow rate is appropriate to control dust and cool
blade.
c. Cease cutting if water stops.
4.
Pre start check list of rock saw (sample attached at end of manual)
to be completed prior to every operation. Pre start check should
include but not be limited to:
a. Operator to check connection to excavator is secure.
b. Hoses are connected appropriately.
c. Head bracket is tight.
d. Rock saw guard is in the correct position and secure.
7