Bend-Pak HD-12LS 설치 및 운영 매뉴얼 - 페이지 8

{카테고리_이름} Bend-Pak HD-12LS에 대한 설치 및 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Bend-Pak HD-12LS 20 페이지. 12,000 pound capacity four-post lift

Bend-Pak HD-12LS 설치 및 운영 매뉴얼
STEP 5
( Runway Installation )
1. Locate the runway with the cylinder attached
underneath. This runway will be located adjacent the
column with power unit bracket attached.
2. Position the holes on the side of the runway near
the power unit location. (See Fig. 8)
3. Line up the front of the power-side runway with the
cross tube bolt holes then temporarily bolt in position
using the 1/2" x 4" hex bolt, nut and lock washers.
(See Fig. 9)
Fig. 7
4. Position the offside runway on top of the cross
tubes with the utility rails located inside. The
offside runway is not bolted down and can be
adjusted for different tread width vehicles.
Be careful not to damage the chrome cylinder rod
1. Inspect cables to insure proper lengths. All cables
should have ID tags showing proper cable lengths.
2. Make sure the cylinder flange plate is installed with
the guide-block bracket facing AWAY from the cylinder.
3. In order to install the cables it is necessary to first
extend the hydraulic cylinder. Remove the cylinder
port plugs then use an air blow gun or come-along to
extend the cylinder.
4. You must reinstall the rollers, spacers and cable
guards and pins in the same order as they are removed.
(See Fig. 10)
Fig. 8
The nylon cable nuts MUST be tightened until there
is at least 1/4" of threads through the nylon end of
the nut. The cables will remain loose until start up.
8
STEP 6
( Cable Installation )
IMPORTANT!
during this operation.
Fig. 9