Great day RAPID RACK RTR 200 설치 및 사용 지침
{카테고리_이름} Great day RAPID RACK RTR 200에 대한 설치 및 사용 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Great day RAPID RACK RTR 200 3 페이지.
RAPID RACK" Removable Transport Rack
"
READ ALL INSTRUCTIONS BEFORE INSTALLING RAPID RACK.
Instructions for Installation and Use:
FIG. 1
1) THREAD TOGGLE BOLT THRU
APPROPRIATE HOLE ON MOUNTING
BASES TO ALIGN BASE WITH STAKE
POCKET ON TRUCK BED RAIL. REPLACE
BUTTERFLY NUT. SEE FIG. 2
MODEL: RTR 200
CONTENTS: SEE FIG. 1
4-
RAPID RACK UPRIGHTS, 4-LOAD
STOPS, 2-SPLICES, 4-MOUNTING BASES,
4-3/8" TOGGLE BOLTS, 4-5/16" x 2"
BOLTS, 12- 5/16" x 2-1/4" BOLTS, 8-FLAT
WASHERS, 16-5/16" LOCKNUTS.
FIG. 2