Hi-Force ALUMINIUM HP252 사용 설명서 - 페이지 9

{카테고리_이름} Hi-Force ALUMINIUM HP252에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Hi-Force ALUMINIUM HP252 15 페이지. Hp-manually operated hydraulic pump
Hi-Force ALUMINIUM HP252에 대해서도 마찬가지입니다: 사용 설명서 (6 페이지)

Hi-Force ALUMINIUM HP252 사용 설명서
6.1 Before First Use / Preparation
Check for any signs of wear in the pump or connected components.
Unscrew the transit plug (3) and fit the breather (4) this will maximise the oil volume available and
prevent oil reservoir pressure build up.
6.2 Filling the Pump with Fluid - ISO15 grade.
IMPORTANT:
Only add fluid to the reservoir when the connected system is fully de-pressurised and
returned to its closed position. Failure to do so will result in the system containing more fluid
than the reservoir can hold.
Fill / top-up the pump as follows:
Stand the pump on a firm, level surface.
Remove the transit plug/breather (3/4) from the reservoir.
Fill the reservoir with clean, high quality ISO15 hydraulic oil, leaving a small air space of
approximately 1-2cm between the top of the fluid and the filler plug.
Replace the transit plug/breather (3/4).
6.3 Hydraulic Connections
Remove the hexagon headed plug and make a hydraulic connection to the outlet port (6). This port has a
3/8" NPT female thread, and the connection should be sealed, as appropriate, with a suitable thread sealant.
DO NOT overtighten this fitting. It can cause damage to the pump head or lead to failure
of the fitting at below rated pressure.
When making a connection between two couplers, ensure that these connections are fully connected, with
no thread gap and hand tight only.
To do so: Ensure that all threads are clean with no damage [1] Press the male coupler into the female
coupler, [2] then turn the threaded-collar clockwise (by hand) until the threads are fully engaged.
Operating Instruction Manual:
OM-HP-ALUMINIUM-01

6.0 Installation / Setup

9
Serial Numbers:
From: DF2001