Aircommand 5860001 매뉴얼 매뉴얼 - 페이지 7
{카테고리_이름} Aircommand 5860001에 대한 매뉴얼 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Aircommand 5860001 17 페이지. Roof top air conditioner
6. Assess Roof Thickness
• Measure the roof thickness and consult the table across to
check if adjustments to the duct length are required.
• NOTE: If the duct length needs to be adjusted then cut the
excess from the un-notched end.
Roof thickness
Comment
(mm)
25
Absolute minimum – ring must be
removed from top of plenum ducting.
30
Use plenum duct as provided
40
50
60
85
115
Absolute maximum
General
Roof less than 30mm – remove duct ring.
rule
30mm or thicker leave duct as supplied
7. Assemble Duct
• Thread a hold down bar onto the M8
bolt and push the bolt almost all the
way into the hole in each corner of
the brace (Fig 9).
• Leave a 10mm gap between the
hold down bar and the recess in the
plastic brace. This will allow for
easier engagement with the four
corresponding threaded holes in the
unit.
• Turn the assembly over and add the
black plastic duct work to the top of
the assembly with the notch
upwards (Fig 10). The notch is shown
circled below.
• Align the notch with the inside fans
power cable.
Note: Some installers fi nd it easier to
attach the duct to the roof top unit fi rst
and then insert the brace assembly.
When attaching the duct to the
unit take care to ensure it forms a
tight, unbroken seal that doesn't allow
cold air to escape.
"
"
"
"
Fig 9: Insert the four M8 bolts and hold down bars into the corners of the brace.
Fig 10: Fit the black plastic duct onto the brace assembly ensuring a tight, sealed fi t.
Duct length
(mm)
60
65
75
85
95
120
150
Duct length =
Roof thickness + 35mm
Bolt length
Standard
Standard
Standard
Standard
Standard
Limit of std bolt
Installer to provide
Roof greater than 85mm thick will
require installer to provide longer bolts
7