Great Lakes GL24SR 설치 지침 매뉴얼 - 페이지 7
{카테고리_이름} Great Lakes GL24SR에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes GL24SR 12 페이지. 19" eia wall mount swing rack
Great Lakes GL24SR에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (8 페이지)
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
8
7
both pins (top and bottom) and then open the Swing Frame Rack similar to
that of a door.
LEFT HAND SWING
CAUTION:
LEFT HAND
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
8
7
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
6
6
8
D
C
B
Secure retractable pins into
A
receptacle (2 locations)
8
5
4
OR
RIGHT HAND SWING
5
7
4
7
3
RIGHT HAND
6
3
5
6
5
2
1
2
1
4
7
4
D
C
B
A