Great Lakes GL48SR 설치 지침 매뉴얼 - 페이지 6
{카테고리_이름} Great Lakes GL48SR에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes GL48SR 8 페이지. 19" eia wall mount swing rack
Great Lakes GL48SR에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (12 페이지)
STEP 2
Mount the rear assembly to the wall with four lag screws (These are not
provided. The customer is to determine for type of wall). Mounting locations
are as shown.
Install the 19" EIA Swing Frame by retracting both pins. The pins can be locked
out for ease of assembly by retracting the outside pin into the slot provided.
The retractable pins are to be near the front of the Swing Frame when
installing.
Release the lower pin then, align the top pin to the top receptacle and release
pin. Place 1/4-20 Screw through the hole in bottom (opposite pin hinge).
Assemble spacer on exposed threads on inside of swing rack and close
Swing Frame. Tighten screw by screwing into pem nut in Swing Frame.
Repeat screw/spacer assembly for top. Finally, tighten 8 screws on the top
and bottom braces.
1/4 - 20 screw
19" Swing
Frame
Assembly
Retractable Pivot Pins (qty. 2)
6
1/4 - 20 screw
LEFT HAND ASSEMBLY SHOWN
Mounting
Dimensions
Part No.
GL24SR
GL36SR
GL48SR
16.00" on
center
Receptacles for
Pivot Pins
1 in top, 1 in bottom
Height
18" on center
30" on center
42" on center