Great Lakes GL48SRD 설치 지침 매뉴얼 - 페이지 2
{카테고리_이름} Great Lakes GL48SRD에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes GL48SRD 8 페이지. 19" eia srd swing rack
Great Lakes GL48SRD에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (12 페이지)
PREFACE
This manual is provided to prevent service personnel from committing an act
that results in the risk of fire, electric shock, or injury to persons. Only trained
service personnel should receive, unpack, and assemble the SRD Swing
Rack. In addition, only trained service personnel should install equipment in
enclosures.
SAFETY SYMBOLS USED IN THIS MANUAL
This manual provides general safety guidelines to be observed during
installation, operation, and maintenance of the SRD Swing Rack.
WARNING: Failure to follow directions in the warning could result in injury to
persons or loss of life.
CAUTION: Failure to follow directions in the caution could result in damage to
equipment or storage data.
SAFETY CONSIDERATIONS
WARNING: Improper handling and use of the SRD Swing Rack could result in
equipment damage, serious injury, or possible death.
Only UL® Listed ITE (Information Technology Equipment) units should be
installed inside the SRD Swing Rack.
Be sure to read and follow all individual manufacturer equipment manuals for
safety and installation instructions.
Proper spacing is required when installing electrical equipment to avoid
electrical shock.
INSTALLATION
Loading Equipment
WARNING: Only install equipment after the SRD Swing Rack has been properly
secured. Do not move the SRD Swing Rack assembly while loaded.
MAXIMUM LOAD CAPACITY: 100 pound capacity for every size of
SRD Swing Rack
2