Great Lakes UL60950-1 설치 지침 매뉴얼 - 페이지 3

{카테고리_이름} Great Lakes UL60950-1에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes UL60950-1 12 페이지. 4 post equipment racks
Great Lakes UL60950-1에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (8 페이지), 설치 지침 매뉴얼 (13 페이지)

Great Lakes UL60950-1 설치 지침 매뉴얼
Only UL
Listed ITE (Information Technology Equipment) units should
®
be installed inside the rack.
Be sure to read and follow all individual manufacturer equipment
manuals for safety and installation instructions.
Proper spacing is required when installing electrical equipment
to avoid electrical shock. Maintain minimum spacing between the
accessories and components and the computer enclosure assembly
for safe operation of the equipment when installed in accordance with
the National Electric Code ANSI/NFPA 70-1999.
The ambient temperature operating range for the racks and
accessories is +50 to +95° F (+10 to +35° C). The non-operating
temperature is -4 to +140° F (-20 to +60° C).
4PM6 FOUR POST RACK
OVERVIEW
4PM6 Racks are designed to securely hold 19" rack mount equipment,
networking equipment, etc.
Components of the 4 Post Rack will ship in three separate boxes.
Boxes will be marked with the box number and an item number.
What's Included:
Component
Vertical Uprights (2 left/2 right)
Rack Mounting Hardware
Top Width Brackets
Bottom Width Brackets
Rack Assembly Hardware &
Grounding Lug
Top Depth Brackets
Bottom Depth Brackets
Qty.
Component will ship in:
4
Box #1, Item GL4PM6
50
2
2
Box #2, Item GL4PBT
-
2
Box #3, Item GL4PFB24XX
(XX=24, 29, 32 or 36)
2
3