Great Lakes Biostar V 운영 매뉴얼 - 페이지 13
{카테고리_이름} Great Lakes Biostar V에 대한 운영 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Lakes Biostar V 16 페이지.
Note: To ensure a tight seal between the pressure chamber and the cup, pellets should be
completely removed from around the rim.
At this point in the process, the material has been formed over the model and is cooling under
pressure.
At the end of the cooling phase, a series of short beeps will sound. Release the pressure
by pressing the air evacuation button. Another series of short beeps will indicate when the
pressure has cleared and the chamber can be unlocked and open. To unlock the chamber,
swing the locking handle from the front of the unit to the back. Move the clamping frame
handle to the left until it stops releasing the material.
To initiate heating, swing the heating element
over the clamped material and the programmed
time will start to count down automatically. With
five seconds remaining in the heating phase,
a series of short beeps will sound, at zero, a
sustained beep will sound.
Swing heater back to its full rest position. Swing
the chamber over the model and activate the air
pressure by moving the locking handle from the
back of the machine to the front of the machine
until it locks.
The appliance is now cool to the touch and
ready for finishing.
12