Great Little Trading L5355 빠른 시작 매뉴얼 - 페이지 10

{카테고리_이름} Great Little Trading L5355에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Great Little Trading L5355 16 페이지. Star bright chest of drawers

Hardware for Step 10:
12x #11 Screws 16mm
#11
#11
#11
#11
#11
E
STEP 10: Locate 2x back panels (H) and place within the recessed groove of the
panels ensuring that the pilot holes on panels (H) line up with the pilot holes in the
unit. Once in place secure with 12x screws (#11) where indicated.
Note that the holes on the top corners need to be left to attach the anti tip kit
to secure the unit to the wall (see separate instructions included in pack). See
Step 19.
#11
#11
#11
H
H
#11
#11
#11
B
C
D D D
F
Hardware for Step 11:
8x #7 Cam Dowels
#11
#7
STEP 11: Prepare the large drawers by inserting 4x cam dowels (#7) to large
drawer front (I). Repeat this for the second front drawer panel (I).
10
I
#7
#7
#7
x2