AFFIX MADW 220-AGR 조립 설명서 - 페이지 9
{카테고리_이름} AFFIX MADW 220-AGR에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. AFFIX MADW 220-AGR 20 페이지. Aluminium double width mobile towers
ASSEMBLY
08
Step 5
Step 5.1
Step 5.1
Hook the top rung of the AGR frame to
the top rung of the 2nd level frames and
the bottom rung of the AGR frame should
be hooked to the 1st rung of the 2nd level
frames.
Step 5.2
Repeat Step 5.1 for the opposite side but
slide it towards the frame ladders to
provide cover to the platform.
Step 6
Clamp the 4 Stabilizers on all 4 corners
as per the Components Table on Page
no. 17. For detailed instructions on
installation refer to Page no.15.