AFFIX MADW 420-AGR 조립 설명서 - 페이지 11
{카테고리_이름} AFFIX MADW 420-AGR에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. AFFIX MADW 420-AGR 20 페이지. Aluminium double width mobile towers
ASSEMBLY
Step 9
Step 9.1
Step 9.1
Hook the Diagonal Brace to the 3rd Rung
of the 2nd level Span frame at one end
and the other end should be hooked to the
1st Rung of the 3rd level Ladder frame.
Step 9.2
Step 9.2
Hook the 2nd Diagonal Brace to the 3rd
Rung of the 2nd level Ladder frame at one
end and the other end should be hooked
to the 1st Rung of the 3rd level Span frame.
Step 10
Step 10.1
Step 10.1
Hook the top rung of the AGR frame to
the top rung of the 3rd level frames and
the bottom rung of the AGR frame should
be hooked to the 1st rung of the 3rd level
frames.
10