AFFIX MADW 520-AGR 조립 설명서 - 페이지 17
{카테고리_이름} AFFIX MADW 520-AGR에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. AFFIX MADW 520-AGR 20 페이지. Aluminium double width mobile towers
STABILIZERS
To move the tower to a new position, first prepare the
tower.
Check that the wind speed does not exceed 17 mph.
Ensure the tower is empty (material and personnel).
Check the overhead obstructions including electrical cables.
Raise the stabilizer feet (only enough to clear obstructions, maximum 25mm).
Taking care to ensure tower stability is maintained, release the castor brakes.
Carefully move the tower by manually applying force at the base. Do Not Use mechanical
means to move the tower.
Once positioned, prepare the tower for use.
Check and adjust as necessary to ensure all castors and stabilizers are in firm contact with
the ground.
Check that the tower is vertical.
Reapply the castor brakes.
Certified and independently tested for use.
Compliant to AGR Assembly process.
Safe working load on the platform is 250kgs/Sq Mtr, evenly distributed.
Maximum permissible distributed load on the tower 750 Kgs.
The scaffold towers referred to herein have been tested by
16