HiB Novum N19FSCLCGR 피팅 지침 매뉴얼 - 페이지 5
{카테고리_이름} HiB Novum N19FSCLCGR에 대한 피팅 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HiB Novum N19FSCLCGR 8 페이지.
Installation
1. Plan the position of the unit on the wall.
2. Mark the drill location onto the wall through the pre-drilled holes in the rear
cross rail of the unit. See Fig. 1.
3. Drill holes in wall and fix the unit into position with suitable fixings.
4. Silicone along the top edge of the unit and fit the basin as per Fig. 2. Silicone
along back edge of basin and along the back of the unit and wall as per Fig. 3.
Allow to set fully.
5. Fix tap in place, and finalise water and waste connections.
6. Secure handle in place using the pre-drilled holes in the door.
hib.co.uk
5