Celec ES-30 현장 설치 매뉴얼 - 페이지 7

{카테고리_이름} Celec ES-30에 대한 현장 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Celec ES-30 10 페이지.

Field Installation Manual
Use these instructions
If 125 Amp circuit breaker is unavailable, existing blanks are available.
ES-30 unit is designed for use with Customer Main Breaker Panel Three Phase
120/208V AC WYE/Delta Connection, up to 600 Ampere.
ES-30 units should be mounted with four appropriate sized fasteners before connect to Main Breaker
Panel.
1.
Switch off the external handle of load break switch (LBS), using panel key open the door of
ES-30 exposing connections.
2.
Remove existing 3 Pole breaker blanks and install new 3 Pole 125 Amp circuit Breakers.
3.
For rest of connection follow the Connection type#1 on page 5.
______________________________________________________________________________________
ES-30
Connection Type#2
7