Gaines Keystone Series 설치 및 조립 지침 - 페이지 2
{카테고리_이름} Gaines Keystone Series에 대한 설치 및 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Gaines Keystone Series 2 페이지.
Attach Curved Arm
A. Position the Curved Arm with square cut end pointing up and the opposite end (has 'mouse
hole' cutout) facing toward the post.
B. Push the square end of the Curved Arm into socket in the center underside of the Beam.
(Don't be concerned if Curved Arm does not seat entirely against the underside of the beam).
C. Install 5/16" 18x1" bolt through the access 'mouse hole' in lower end of the Arm and
firmly tighten to secure the Curved Arm against the post.
Attach Mailbox
A. Place the Mailbox onto the mounting tray portion of the horizontal Beam.
B. With the Mailbox door pointing in the desired direction, align the four mounting holes in
the floor of the Mailbox with the corresponding holes in the tray portion of the Beam.
C. From the inside of the Mailbox, install 4 bolts (¼" – 20 X 1") through the 4 holes in the
mailbox and mounting tray and place nuts onto the exposed end of the bolts. Using the
Phillips screwdriver and the socket or wrench, tighten the nuts securely.
Attach Finial to Top of Post
A. The square base of the Finial will press fit into the open square top of the post.
B. If desired, clear exterior silicone adhesive (available at your local hardware store) may be
applied to the inside walls of the post before inserting the Finial into the top of the post.
Congratulations. You have successfully completed the installation of your Gaines Keystone Series Mailbox and Post. You will enjoy many years of service from this product.
CUSTOMERS ARE REQUESTED TO CONTACT THE LOCAL POST OFFICE BEFORE ERECTING THE BOX TO ENSURE ITS CORRECT PLACEMENT AND
©2007, GAINES MANUFACTURING, INC.
HEIGHT AT THE STREET.
The small plastic caps
are included for your
convenience and may
be used to cover any
unused screw or bolt
holes on the main post.
REV. 2007B