C11 & CGE PRO
The C11 is our second largest Schmidt Cassegrain telescope and suitable for mobile use. Every time
one likes to use it, one has to put it up again from scratch. The purpose of this article is to describe
the details of this process.
Scattered pieces
To protect the sensitive electronics from humidity and other harsh weather conditions they are stored
in the lab course room. The remaining mechanical parts stay in the dome, so that one does not need
to carry them around.
Stored in the dome:
1.
the tripod
2.
the tube (C11)
3.
counterweights + bar
Stored in lab course room:
1.
the CGE PROs electronic box
2.
the CGE PRO mount
3.
a box containing all 1.4" eyepieces and the corresponding filters
4.
sun filters
Setup
1.
The CGE PRO is a parallactic mount, which has to be adjusted to point to the northern celestial
pole. Therefore, the tripod (see
sufficient to point the tripod leg with the carrier for the hand terminal to the south.
2.
Now put the electronic box on the tripod (see
3.
Place the mechanics of the CGE PRO (see
three bolts (see
performed by two people.
4.
Screw the counterweight bar into the mechanics and place the counterweights on it (see
figure
6). When you fasten the screws on them, they are hold in place.
5.
Connect the electronic box to the engines of the mount. The cables (see
ports on the side of the electronic box
one connects electronic box with the right-ascension axis, while the longer one is for the
declination axis (see
6.
Now plug the energy supply (see
corresponding ports (see
7.
The attachment of the tube should also be performed by two people. One inserts the dovetail
into the clamp of the mount (see
OST Wiki - https://polaris.astro.physik.uni-potsdam.de/wiki/
figure
figure
5). Due to the heavy weight of the mechanics, this step should be
figure
9). The cables only fit in one position.
figure
figure
12).
figure 13
1/7
1) should be positioned accordingly. To do so, it is usually
figure
2) and fix it with three bolts (see
figure
4) on the electronic box and fix it again with
(figure
8). The cables have different lengths. The short
10) and the hand terminal (see
and
figure
14) and holds it in place. The other one
C11 & CGE PRO
figure
3).
figure
7) go in the
figure
11) into the