Gainsborough G+ LOCKSET 설치 지침 매뉴얼 - 페이지 2

{카테고리_이름} Gainsborough G+ LOCKSET에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gainsborough G+ LOCKSET 8 페이지. G+ series for the apex electric locksets and volt electric locksets

Task 1
1
2
Door lever height mark
3
Power transfer
unit heights
Lever height
marking
Strike heights
• Hold faceplate up to the door making sure that the correct
• If rehanding is required, insert a flat blade screwdriver under
• Position and hold the inside G+ Lockset onto the door
• Carefully make a mark on the door frame at the same
• Remove the G+ Lockset.
• Position the template supplied (see packaging) on the
• Firmly hold the template and mark the 2 Power Transfer
1/2 door thickness
• Remove the template and measure the door thickness.
• Drill the 2 top holes diameter 1 inch through the frame.
• Drill the 2 bottom holes diameter 1 inch by 20mm deep
1/2 door thickness
• Chisel wood to join the 2 top holes (power transfer
• Chisel wood to join the 2 bottom holes (strike holes).
NOTE: The door furniture faceplate levers are supplied in a
neutral position. These need to be "handed" before installation.
faceplate is used. i.e. outside faceplate to outside door face.
(The outside faceplate is the one with the sliding cover).
Turn the lever in the required direction until it "clicks" into
place. Do this for both the outside and inside faceplates.
handing plate and twist. Rotate lever towards top of the
faceplate and remove screwdriver. Continue to rotate lever
for 180° until it "clicks" into place.
NOTE: If the Door Frame has previously been prepared, then
go straight to Step 4. (i.e. if there are 2 holes in the door frame)
face to determine the most suitable height of the lock
(this height will vary depending on the door style).
height as the door lever.
door frame so that the lever height centreline aligns with
the lever height mark you made in the previous step.
Unit heights (top markings) and the 2 Strike heights
(bottom markings) on the frame.
Divide this size in half and measure this size from the jam.
(Take note of any weather strips that may be fitted to the
door jam). Mark this position on the 2 Power Transfer Unit
markings and the 2 Strike markings. (Diagram 3)
(or through if the frame thickness is near this size).
unit holes).