Gaius DUO 17788 설치 지침 매뉴얼 - 페이지 4

{카테고리_이름} Gaius DUO 17788에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gaius DUO 17788 11 페이지. Electrical high adjusting, floor drain

Gaius DUO 17788 설치 지침 매뉴얼
Structure
The product has undergone static load testing at 500 kg. The size of the wall mounting fixtures is
700x1110 mm. The fixtures must be affixed to solid structures. The fixtures must be mounted in
accordance with the measurements specified in the diagram.
Electrics
The electrical junction box must be positioned to the right of the mid-line, as shown in the draw-
ing. IP44 or higer junction box (not included)
The base comes with a 230V AC 10A socket.
A residual-current device is recommended for the 230 V AC power supply.
A qualified electrician must perform the connection.
HVAC
The water connection must be positioned to the left of the mid-line, as shown in the drawing.
1. Mid-line
2. Wall
3. Electrical connection
4. Water connection. Water supply with a shut-off valve equipped with a G1/2"external thread.
Thread downwards
5. Wall mounting fixtures
6. Finished floor
7. Wastewater connection on the floor (Ø110 mm).
8. Reinforce area, plywood 36mm or over, solid wood 45mm or over.
240mm
= 30 mm!
7
0 110 mm
125+15-10 mm
Note the dimensions!
2
2
5
60 +15-10mm
3 and 4: The electrical and water connection must not extend
from the wall by more than 50 mm. NOTE! Exceeding the maxi-
mum depth of 50 mm prevents the toilet seat's downward
movement!
700
1
4
3
505mm
8
6
4