Celexon battery screen V2.0 Professional Plus 사용 설명서 - 페이지 6
{카테고리_이름} Celexon battery screen V2.0 Professional Plus에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Celexon battery screen V2.0 Professional Plus 12 페이지.
MOUNTING ON THE CEILING (VIA EYELETS)
Measure the distance between the
eyelets.
Mark
the
ceiling and make sure that the eyelets
are aligned with each other and parallel
to the wall.
Drill the holes at the markings at a
diameter to match the diameter of
the ring eyelet used, screw them
fi rmly into the ceiling (according to the
manufacturer's instructions and the
load capacity of the screen) and hang
the screen with the help of carabiners.
MOUNTING ON THE CEILING (SCREWED)
Measure the distance between the
holes in the side caps (two per cap)
and transfer them to the ceiling. Drill
the holes at the markings to the right
diameter for the mounting material,
insert and screw the screen in place
tightly. Make sure that the holes are
parallel to the wall.
points
on
the
5