DBK Drymatic Boost Bar FGPH109 사용 설명서 - 페이지 7

{카테고리_이름} DBK Drymatic Boost Bar FGPH109에 대한 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. DBK Drymatic Boost Bar FGPH109 16 페이지. Adaptable heat drying system
DBK Drymatic Boost Bar FGPH109에 대해서도 마찬가지입니다: 사용 설명서 (18 페이지)

2.2 (Optional) - Connect Drymatic Boost Bar Adaptors*
Drymatic Boost Bar has been designed to work with a series of adaptors that allow you to target the heated airflow into
areas that may otherwise be difficult to access such as crawlspaces, ceiling voids, cavity walls, and tented areas.
The Boost Bar is supported by the following adaptors:
A)
4-Port Adaptor: 4 x 4" (100mm) Connections
This gives you the ability to split the heated airflow into four separate channels. You can now heat four separate
areas at the same time. The connector accepts both PVC hoses and lay flat ducting.
B)
12-Port Adaptor: 12 x 1.5" (38mm) Connections
This gives you the ability to split the heated airflow into 12 separate 1.5" (38mm) channels. You can now use these
outlets to heat up difficult to reach locations such as wall cavities, ceiling voids, kitchen cabinetry, and subfloor
areas.
C)
90° Adaptor
This gives you the ability to angle the airflow downwards into a crawlspace or subfloor area. Alternatively the
connector can be rotated and the airflow can be angled upwards into the ambient air, keeping the warm dry air
away from sensitive flooring materials etc.
Lay flat ducting can be attached to the outlet of this adaptor to take heated airflow up to ceiling level if required.
3
. Power up the machines
Plug the air mover and the Drymatic Boost Bar into an appropriately rated power outlet/s. Switch the air mover on first, then
use the red power switch to turn on the Drymatic Boost Bar. It is good practice to switch on the air mover first, but not
essential.
* See Pages 9-11 for further details on setting up the Boost Bar with the Adaptors