Dynapac CA 152 워크샵 매뉴얼 - 페이지 6
{카테고리_이름} Dynapac CA 152에 대한 워크샵 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dynapac CA 152 11 페이지. Converting drum std/d to p/pd
FITTING
Fig. 3 Fitted M16 bolts
Fig. 4 Drum
Fig. 5 Fitting the second pad half
4
Fit the two M16 bolts
(items 4, 5 and 6 in drawing 38 53 45).
Run the roller slowly forward until the drum is located
with the first fitted drum shell at the bottom.
Two wooden joists 50x70 mm (2x3") with bevelled
ends.
The space required for this operation is 3 meters
(120"). The pad half nearest to the platform/cab must
be about 100 mm (4") to the upper edge of the drum
frame.
Make sure that no one is inside the
working range of the machine when you
drive it forward.
Lift the second pad half in place and align it against the
outer edges of the drum.
Keep well clear of the hoisted object.
Ensure that hoisting hooks are securely
anchored.
CA 150/152 W1080EN1