activTek A1019B 설치 매뉴얼 - 페이지 4
{카테고리_이름} activTek A1019B에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. activTek A1019B 8 페이지. Electronic air purification system
3.
Find suitable location for cell,
near the center of the coils.
Clean area to remove grease
or dirt. Place cell to attach
Velcro.
NOTE: Remove cell by
separating the Velcro. Press
Velcro attached to unit firmly
to ensure a good bond.
Replace cell into unit.
4.
Connect cell wires to socket of
ActivePure cell. These wires
are a push connection; push
until firmly seated. They are
not connected when shipped
to allow for more options in
wire routing.
5.
The ballast is shipped with the
voltage switch, located on the
end of the ballast, pre-set to
the 230V position. Ensure that
the voltage switch, is set to
the appropriate position for
your application.
NOTE: The 230V setting is for
208 & 230V applications.
4
Blue Wires
120 - 230 V
Voltage Switch
Red Wires
RED
BLUE
Blue Wires
Red Wires