activTek DUCTWORX 소유자 매뉴얼 - 페이지 13

{카테고리_이름} activTek DUCTWORX에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. activTek DUCTWORX 16 페이지.

FIBERGLASS DUCTWORK INSTALLATION
5
5. Insert (4) 2" Threaded bolts into screw holes at
corners of mounting plate. Attach (4) toggle bolt
anchors to ends of threaded bolts.
7
7. Insert (4) toggle bolts into 3/8" holes in duct. Be
sure toggle anchors open after inserting.
9
9. Insert unit into opening. Be sure the air will pass
though the ActivePure® cell honeycomb matrix.
11
11. Plug unit into working power receptacle. Hard wiring unit into
HVAC system should be done by a licensed HVAC installer or
electrical contractor only.
6
Stud
6. Remove backing from mounting plate
adhesive gasket.
8
8. Center large opening in mounting plate over
3.5" opening in duct and press plate to duct.
The adhesive gasket will hold the mounting
plate into place.
Tighten toggle bolts - DO NOT OVERTIGHTEN.
10
10. Secure the unit to the mounting plate with (4)
#8-32 nuts.
(CONTINUED)
9