DCM SOLUTION ESV710 설치 매뉴얼 - 페이지 8

{카테고리_이름} DCM SOLUTION ESV710에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DCM SOLUTION ESV710 20 페이지. Sanitizing tunnel

ESV710
Sanitizing tunnel

4 Installation

4.1 Required tools

 Industrial hammer drill
 10mm Widia Solid CarbideDrill for concrete
 4 10mm expansion metal plugs (type FISCHER steel MR10).
 14 and 17mmwrench.
 Mm Hexkey set.
Please carefully read all sections before starting the installation.

4.2 Preliminary work on site

Verify the position and location of the equipment according to the general
installation.
Depending on the area of installation of the equipment, there are two posible
variants.
1. If the floor is concrete, the installation can be carried out, with the help of
steel or chemical drills, by placing the drills in a position that matches
with the anchoring holes of the cabinet, either by means of the
installation plane or with a template.
2. In all the cases where the floor is not concrete, the installation should be
done on a bulk head plate. It must be made with threaded rods ØM10,
according to the installation blueprint, and tacked to the existing ground
with cement. It has to be 10cm below the level of the floor. It must also
be taken into account in this instance, that the threaded rods that are part
of the plate exceed the level of the floor by 5 cm.
Check that the floor or concrete base where the cabinets will be mounted is
even and leveled +/- 5mm in the area of attachment of the cabinets.
www.dcm.com.ar
Installation Manual
Page.: 8of20