Copernicus PDR05 조립 설명서 - 페이지 6
{카테고리_이름} Copernicus PDR05에 대한 조립 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Copernicus PDR05 11 페이지. Double sided art easel base model
You will need: (Not to Scale)
2
Insert Drying Racks
You may need to tighten
slightly as you go up with
the racks. Tighten all bolts
(8) after all Drying Racks are
assembled.
You will need: (Not to Scale)
3
Install Casters
6
Drying Rack
x5
Caster
x4
PDR05 - Version A - Released November 21, 2022 - Copernicus Educational Products Inc.
We recommend installing the racks with this side
facing upwards - easier to slide paper off the rack
Install racks every other
hole starting at the bottom
hole
Up
Press Casters firmly into the
Frame. Casters will click into
place. If necessary, place a wrench
between the wheels & tap in with
a rubber mallet.