2hp Comp 매뉴얼 - 페이지 4

{카테고리_이름} 2hp Comp에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. 2hp Comp 7 페이지.

2hp Comp 매뉴얼

Installation

To install, locate 2HP of space in your Eurorack case and confirm the positive 12
volts and negative 12 volts sides of the power distribution lines. Plug the connec-
tor into the power distribution board of your case, keeping in mind that the red
band corresponds to negative 12 volts. In most systems, the negative 12 volt sup-
ply line is at the bottom. The power cable should be connected to the module
with the red band facing the front of the module.

Specifications

• Size: 2HP
• Depth 42mm
• Current Consumption:
– +12V: 86mA
– -12V: 3mA
4