Dyness A48100 빠른 시작 매뉴얼 - 페이지 2

{카테고리_이름} Dyness A48100에 대한 빠른 시작 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dyness A48100 8 페이지. Battery and solis setup

Dyness A48100 빠른 시작 매뉴얼
1.3 Meter wiring: meter interfaces 1 and 4 are connected to power
grid L and N respectively; 5. 6 connected to CT; Connect the
power meter RS485 to the inverter RS-485 meter interface through
the network cable in the accessories; The CT is clamped on the
live wire of the power grid (pointing to the direction of the power
grid)
It's normal standard pin-pin cable between battery and
inverter ,also battery and battery.