CopperOptics 150-1303-01 매뉴얼 - 페이지 6

{카테고리_이름} CopperOptics 150-1303-01에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CopperOptics 150-1303-01 7 페이지. 8 channel cot pots unit

Section 363-703-103
Revision 01
Page 6
TABLE 2. FLC-703 CHANNEL UNIT TURN-UP AND TESTING
Observe normal electrostatic discharge precautions when handling
electronic equipment. Do not hold electronic plugs by their connector
edges. Do not touch components or circuitry.
Step
Operation
1
Install
a. Insert each FLC-703
COT
Channel Unit into the
Channel
COT Shelf.
Units
b. After the system has
powered up,
established HDSL
synchronized
communications, and
no calls are in
progress, observe the
Channel Unit front
panel indicators.
2
Test
a. Test each subscriber
Subscriber
circuit by placing and
Circuits
receiving calls.
CAUTION
Action
All LEDs on the Channel
Unit will turn on for
approximately ½ second,
then scan from top to
bottom, then flash all on,
then off.
ACTIVE 1
ACTIVE 2
ACTIVE 3
ACTIVE 4
ACTIVE 5
ACTIVE 6
ACTIVE 7
ACTIVE 8
FAULT
ACTIVE 1 through 8
LEDs track call progress
as described in paragraph
7.01.
Observe
off
off
off
off
off
off
off
off
off