Dyness Tower T10 빠른 설치 매뉴얼 - 페이지 7
{카테고리_이름} Dyness Tower T10에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Dyness Tower T10 8 페이지.
11
Goodwe ET Inverter
1
Dyness has a standard communication network cable. It is recommended to use the GW configuration
network cable and directly connect to the CAN port of the battery BDU.
Note: PV Master selects
the TOWER PRO version,
to ensure that the inverter
version is: ×××× 22.
12
Solis RHI Series Hybrid Inverter
Use the configuration standard network cable.
TOWER System Expansion
13
Module expansion
It is necessary to ensure that the power of
the added module is 100%, and the power
of the expanded system is also 100%.
(The dealer is required to provide SOC
100% module. If you operate by yourself,
please follow the following steps.)
13a
Add the module to be charged between BDU and Base.
Note: If you don't have equipment, please ask the dealer to fill up the capacity of the module you need to increase.
Tower T series
Tower T series
SOC=100%
SOC=100%
The 2 terminals are the Ethernet cable of the RJ45 terminal.
The 2 terminals are the Ethernet cable of the RJ45 terminal.
13b
Charge it with DC power supply until BDU is cut
off, indicating that SOC is 100%.
BMS