DDL S-HEF 설치 매뉴얼 - 페이지 2

{카테고리_이름} DDL S-HEF에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. DDL S-HEF 2 페이지.

INSTRUCTIONS
1
Mark the lower edge of the divisional building entry on the
internal wall of the building
Place the drilling template (included in delivery) against the
2
wall and mark all five drill holes on the wall
Drill dowel holes into the wall 4 x Ø 10 x 60 and insert
3
dowels (included in delivery)
Choose the drilling diameter for centric penetration
4
opening in building and drill
- up to 9 mm OD* cable/pipe  Ø 10 mm
- up to 19 mm OD* cable/pipe  Ø 20 mm
- up to 29 mm OD* cable/pipe and glass fibre cable 2 x 7
- up to 36 mm OD* cable/pipe  Ø 40 mm
- up to 40 mm OD* cable/pipe  Ø 45 mm
* outside diameter
Lead the cable/pipe through the wall to desired length,
5
facing the ground
- when using type S-HEF EDS lead the cable through the
red dirt guard sealing beforehand, facing the ground
(2 x 7 or 12 – 16)
- when using types S-HEF DD and DD GF first lead the
cable through the S-HEF housing and then through the
(adapted) red segmental ring seal insert
When using the red segmental ring seal insert, adapt it to
6
the cable/pipe diameter by removing the appropriate
segmental rings. See section "Adapting the segmental ring
seal insert" for instructions
Press the red seal insert over the cable/pipe to the wall
7
(caution: open segmental ring side must be facing the
wall!)
Pull the S-HEF housing with inserted rubber sealing plate
8
over the cable/pipe and press it to the wall while pressing
the red seal insert into the opening of the housing back
Screw together with four pieces of hexagon screws 7 x 60
9
and washers (included in delivery) until the rear housing
frame with inserted rubber sealing plate lies completely
against the wall and is securely fastened.
When using type S-HEF DD install another assembly kit
facing the ground by repeating steps
When using type S-HEF ED protect the penetration on
the external wall against impurities with sealing material
(not included in delivery, e.g. foam) upon completion.
SELECTION OF SEGMENTAL RING
Segmental ring
cuts at
element
[mm]
1 (blind cover)
10
2
14
3
18
4
24
5
30
6
36
7
42
 Ø 30 mm
.
6
9
cable diameter
from [mm] to [mm]
6
10
>10
14
>14
18
>18
24
>24
30
>30
36
>36
40
1
3
4.2
6
7.2
8
ADAPTION OF SEGMENTAL RING SEAL INSERT
• Determine the adequate
segmental ring diameter
with the help of the table
• Open the segmental ring
seal insert at the junction (a)
• Unfold the segmental
ring seal insert
• Detach the segmental ring blind cover (1) and the surplus
segmental rings (2 – 7) anually from inside to outside.
Caution: detaching too many segmental rings will impair the
tightness
• Place the segmental ring insert around the cable/pipe, close
it and press it to the wall. Caution: open segmental ring side
must be facing the wall
2
4.1
5
7.1
7.1
7.3
9
(a)
(2 – 7)
(1)