CORA CBL-DT 설치 및 조립 지침 매뉴얼 - 페이지 14
{카테고리_이름} CORA CBL-DT에 대한 설치 및 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CORA CBL-DT 20 페이지. Bike rack - double tier locker
Locker Installation & Assembly Instructions
Cora Bike Rack - Double Tier Locker (CBL-DT)
20. Install locking mechanism guide poles
This step is the same for both the top and bottom rod guides, however the rods for each locker are
different sizes. See components list and images below for details.
Bottom door - rods are the same length
Cora Bike Rack - Australia's Bike Parking Experts - WWW.CORA.COM.AU - PH 1800 249 878
• Insert two (x2) rods through rod guides
in the top and bottom of each door.
Secure using fasteners provided in rod
holders on lock catch.
Top door - rods are 2 different lengths
Rev 1.00 Dec 2020
©