Maico Centro-E 설치 및 운영 지침 매뉴얼 - 페이지 5

{카테고리_이름} Maico Centro-E에 대한 설치 및 운영 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Maico Centro-E 12 페이지. Flush-mounted exhaust air elements for centro centralised ventilation system according to din 18017-3

Maico Centro-E 설치 및 운영 지침 매뉴얼
• the evaluation criteria drawn up by the respons-
ible, regional master chimney sweep are met;
• Parallel operation of air-ventilated fireplaces for
liquid or gaseous fuels and air-extracting equip-
ment can be prevented using safety devices or
• the extraction of exhaust gas from the air-ventil-
ated fireplaces is monitored by special safety
devices. The ventilation system or the fire-
places must be switched off if the equipment is
triggered.

6.3 Technical data table

Rated voltage Centro-
E/Centro-H
Power frequency
Centro-E/Centro-H
Degree of protection
Protection class
Centro-E-APB
Centro-H-APB
Minimum volumetric
flow
Air volume
Sound pressure level
L
WA7
Weight
For more technical data → rating plate.
For characteristic curves → www.maico-ventil-
atoren.com

6.4 Storage

Only store unit horizontally in a suitable, dry
room. Ambient temperature – 10 °C to + 60 °C.
Maico accepts no liability for corrosion damage
caused by improper storage, e.g. storage in a
damp environment.

7 Mounting preparations

Suitable mounting material is to be
provided by the customer.
230 V
50 Hz/60 Hz
IP X5
II
II
30 m³/h
30 / 65 m³/h
26 to 33 dB(A), depend-
ing on unit model
0.8 kg

8 Installation

8.1 Installation information on flush-
mounted housing
The installation of flush-mounted housing
and the shut-off device is described in detail in
the ER/Centro main instructions. Be sure to
proceed as described there. Also observe the
requirements in line with the approval.

8.2 Electrical connection

Centro-E and Centro-H
The electrical connection of Centro-E and
Centro-H devices is described in detail in the
ER UP/Centro main instructions. Be sure to
proceed as described there. The electrical con-
nection must be made in accordance with the
wiring diagram.
Centro-E
8.3 Installation of spiral housing and
upper part of housing
DANGER Danger to life from electric
shock.
Prior to accessing the connection terminals,
switch off all supply circuits. Switch off mains
fuse, secure against being accidentally switched
back on and position a visible warning sign.
7 Mounting preparations
Centro-H
5