Galvin Engineering CliniLever TCWSJ150C 설치 매뉴얼 - 페이지 3
{카테고리_이름} Galvin Engineering CliniLever TCWSJ150C에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering CliniLever TCWSJ150C 5 페이지. Hospital wall sink set taps w/ 190 gooseneck outlet
Product Installation Guidelines
INSTALLATION
IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Fit Tap Assembly and Connect
−
Remove the spout from the wall elbow
using a hex key. This is to enable easy
installation and prevent the spout being
damaged
−
Place the wall flange over the elbow. Fit
the elbow to the protruding wall spud.
We recommend using thread tape or an
equivalent to ensure the connection
does not leak.
−
Ensure spout connection is pointing up
(vertical).
3. Fit Spindle Assembly
−
Remove handle and flange from cartridge
assembly. Unscrew the ¼ turn ceramic
head part from the threaded sleeve
assembly and screw ceramic cartridge
into the valve body by hand, tighten using
a 17mm spanner.
−
Refit threaded sleeve and spindle.
−
The ¼ turn ceramic head part MUST be
fitted into the wall body prior to refitting
the threaded sleeve and spindle. DO
NOT tighten cartridge by using the
spindle or the threaded sleeve.
© Galvin Engineering Pty Ltd
2. Refit the spout
−
Refit the spout to the elbow. Tighten
the grub screw using a hex key.
Note: Do not overtighten grub screw.
Ensure spout swivels freely once installed.
4. Fit Wall Flange
−
Ensure o-ring is fitted to the bottom of the wall
flange, and then hand-tighten the wall flange
onto the threaded sleeve.
Document No.: 001.00.10.08
Version 1, 12 July 2022, Page 3 of 5