Galvin Engineering CliniLever TCWTC150HC 제품 설치 매뉴얼 - 페이지 2

{카테고리_이름} Galvin Engineering CliniLever TCWTC150HC에 대한 제품 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering CliniLever TCWTC150HC 4 페이지. Cp-bs hospital wall top assembly

Product Installation Guidelines
PRE-INSTALLATION
MOUNTING DETAILS
Wall body
− Wall body must be G5/8" FI and body should be between
0 and 13mm behind the finished wall surface.
TOOLS REQUIRED
Spanner and hex key
Thread tape
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply
conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Fit spindle assembly
Remove handle and flange from spindle
assembly.
Ensure jumper valve and fibre washer are fitted
to spindle assembly.
Screw entire assembly into the wall body.
Fasten securely using a spanner.
© Galvin Engineering Pty Ltd
2. Fit wall flange
Ensure o-ring is fitted to the bottom of the wall
flange, and then hand-tighten the wall flange
onto the threaded sleeve.
Document No.: 001.00.10.18
Version 1, 4 November 2022, Page 2 of 4