Galvin Engineering 201.10.70.10 설치 매뉴얼 - 페이지 11

{카테고리_이름} Galvin Engineering 201.10.70.10에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Engineering 201.10.70.10 13 페이지. Lead safe thermostatic mixing valve cabinet

Product Installation Guidelines
Galvin
Engineering
Tempering Valve Commissioning Report and/or
Maintenance Report
Test Results
Valve considered satisfactory for use: Yes
If No, state the reason and action taken:
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Commissioning Work
It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with
the requirements of the Codes of Practice indicated prior.
Date of Valve Commissioned: _________________________________________________________________
Name of Licensed Plumber: _______________________________ License/Cert No: _____________________
License Plumbers Signature: __________________________________________________________________
Telephone No. _____________________________________________________________________________
Owner/occupiers signature: ________________________________________________Date: ______________
Date of Initial Service Due: ___________________________________________________________________
Thermostatic Mixing Valve or
No
11
Version 1, 13 November 2023, Page 11 of 13
Version 1, 13 November 2023, Page 11 of 13