Dynojet Power Commander V 23-010 설치 지침 - 페이지 5

{카테고리_이름} Dynojet Power Commander V 23-010에 대한 설치 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Dynojet Power Commander V 23-010 5 페이지. 2013 husqvarna nuda 900

FIG.G
FIG.H
FIG.I
I23-010
www.powercommander.com
10 Remove the battery cover
11 Secure the ground wire of the PCV wiring harness with the 6mm ring lug to the
Ground
12 Reinstall the battery cover.
13 Locate and unplug the stock wiring harness from the bike's o2 sensor (Fig H).
14 Reinstall the airbox, making sure all connections are reconnected properly and
15 Reinstall the fuel tank and rear sub-frame assembly.
16 Using the supplied Velcro, mount the PCV module to the front of the airbox,
17 Reinstall the side fairings and the center fuel tank cover.
negative terminal of the bike's battery (Fig. G).
This connector is located under the fuel tank on the left-hand side of the bike.
Trace the wiring harness back from the o2 sensor in the exhaust, if you are
unable to locate this connector.
The stock o2 sensor will no longer be used. It can be removed from the
exhaust, if desired.
that the PCV wiring harness is free and clear of any binding, pinching, and hot
or moving parts.
behind the ECU (Fig. I).
Be sure to clean both surfaces with the supplied alcohol swab prior to
applying the Velcro.
2013 Husqvarna Nuda 900 PCV - 5