Main Access 200101T 조립 지침 - 페이지 2
{카테고리_이름} Main Access 200101T에 대한 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Main Access 200101T 2 페이지. Deck conversion kit
Step 3: Insert the smaller end of the handrail
connector into the top of the lower handrail.
Step 5: Place upper handrail down over the
handrail connector.
Step 7: Pool Installation
Note: Two people are required for installation.
A total weight of approximately 100 lbs. is
required to keep the step from moving once in
place under water. With the assistance of another
person, carefully place the step in the pool. Place
the two sealed bags of sand (not included) in
ballast bags (M) over the ballast tray (D) to hold
the step in place. Walk step back against the pool
wall to prevent swim behind hazards.
*Optional* Purchase (2) Anchors (#200888) to weigh
down the Step. Sand not included.
For Questions Regarding Installation, Please Contact Main Access Customer Service 1-888-333-1134
Deck Conversion Kit
Model #200101T Assembly Instructions
Step 4: Place deck connector on the upper handrail
and place into the hole on the top step.
Step 6: Drill #14 x 1 1/4" screws into handrails
through all upper and lower risers.
Step 8: Deck Mount Installation
With the step in position close to the pool wall,
slide the deck connectors (H) installation position
on either the pool top seat or pool deck. Secure to
the deck with two #8 x 1" screws (N). Use a
minimum of two screws per deck connector.
Secure each deck connector (H) to each upper
handrail (E1) by using a single #8 x 1" screw.
All Finished!