3 - Check Before Start

3 . 1 Mechanical Installation Check

1. Check anchor bolts, nuts, fittings and etc have been installed properly.
2 . Check if all moving parts move freely.
3 . Make sure inside of the columns is clean and no other objects.
4 . Supply grease between slide blocks and columns, cables and pulleys.
5 . Check if the arm lock is locked while raising processing, and adjust lock if necessary.
Note: Loose the screw to adjust when necessary( Fig 10 ).

3.2 Electrical Hook Up Check

Make sure all wiring are same as below circuit diagram ( Fig 1 1 ) .
Attention:
electrical system connection must be done by licensed electrician .
Warning
When installing the power cord for the first time, remove the test cable( short wire)
from the motor and replace it with a cable(wire)
between motor starts is at least more than 2 seconds. Otherwise the motor or AC contactor
may be burnt out.
suggest to use min 3 0 A breaker ( not higher than the wire load) .
Fig 9 Arm Installation Diagram
Fig 10 Pulling Rod Installation Diagram
Page 9 of 19
less than # 12 gauge. The time interval