24V
8.1. HYDRAULIC CONNECTION
An overview of the incoming hydraulic connections and their connection to the coil.
Max. 0.8
8.5 / 10
Max. 4.5
15
Max. 0.8
3 ⁄
Max. 4.5
Connect the flexible hose connectors to the coil's supply connec-
Max. 0.8
tion.
8.5 / 10
Min. 5
8.2. CONNECTING THE CONDENSATE DRAIN- H10 ONLY
Max. 30
17
Max. 0.8
10
Max. 30
Make sure that the condensate water is properly drained and keep
the condensate drain clean and unclogged. The condensate drain
must not be subjected to mechanical strain.
12
Max.
13.8 / 15.3
16
Max. 15.3
Connect the flexible hose connectors to the coil's return connec-
tion.
Max.
39.3 / 40.8
18
Max. 40.8
The condensate drain must be fitted with a P-trap. Pour water in
the condensate drain tray to see if it drains properly. If not, check
the slope
1 inch/3ft