Gree GMV5 Series 기술 및 서비스 매뉴얼 - 페이지 8

{카테고리_이름} Gree GMV5 Series에 대한 기술 및 서비스 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gree GMV5 Series 20 페이지.

Gree GMV5 Series 기술 및 서비스 매뉴얼

3.EQUIPMENT INSTALLATION

3.1 PRODUCT SIZE AND SPATIAL SIZE FOR ELECTRIC
CONTROL CABINET INSTALLATION

3.1.1 PRODUCT SIZE

L × W × H:296×177×56(mm)
3.1.2 SPATIAL SIZE FOR ELECTRIC CONTROL CABINET
INSTALLATION
BACnet gateway shall be installed in electric control cabinet; the front of gateway shall be
hung upward and fixed with 4 screws. See the following fig (for reference).
Warning! Power cord and communication line of BACnet gateway must conduct routing
separately(the distance shall be over 15cm); otherwise, it might lead to BACnet
gateway communication malfunction!
The thin dotted line is communication line and the thick dotted line is the heavy current wire,
GMV BACnet Gateway Technical Service Manual
56mm
98.5mm
177mm
5
296mm