Gree NRQD16G/A-S 소유자 매뉴얼 - 페이지 13

{카테고리_이름} Gree NRQD16G/A-S에 대한 소유자 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gree NRQD16G/A-S 19 페이지. Hot water converter of gmv5 home

Gree NRQD16G/A-S 소유자 매뉴얼
Hot water converter of GMV5 Home Installation and Operation Manual
Notes:
In order to ensure water using safety, water inlet and outlet of thermal insulating water tank must
adopt insulating pipeline (such as PPR plastic pipe); make sure that each section of pipe should not be less than
the following length: L≥70×R2, L is the pipe length (Unit: cm), R is inside radius of pipe (Unit: cm). Conduct thermal
insulating measures; it is not allowed to use metal pipe. In the first time using, make sure that the thermal insulating
water tank has been filled with water before energizing the unit; the thermal insulating water tank should not be
operated without water.
5.1.9 Electric Wire Connection Requirement
(1) Layout of Electric Wire
1) The GMV5 Home belongs to I class home appliance, please take reliable grounded
measures. Grounded measure must be connected to special grounded device, and
should be operated by professional personnel.
2) Creepage protection switch and air switch with enough capacity must be installed in
the circuit.
3) The power source must meet the specified specification of power source or special
circuit for air conditioner.
4) Wire diameter of power cord must be large enough; please refer to the specification
in the following chart.
5)
Install according to national layout rules.
6) Please do not forcibly draw the power cord.
Model
NRZ16G/A-
S
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Type of Power
Live
Source
Wire
220V~50Hz
1
Fig. 5.7
Minimum Sectional Area of Power Cord (mm
Zero
Ground
Line
Wire
1
1
10
2
)
Capacity of Air Switch
(A)
10