Adey Midi 150 설치 및 서비스 - 페이지 12

{카테고리_이름} Adey Midi 150에 대한 설치 및 서비스을 온라인으로 검색하거나 PDF를 다운로드하세요. Adey Midi 150 19 페이지. Digital pressurisation unit

6 .24 Controller menu diagram
Power 'on'
Start up screen
Delay
Advanced menu
Pump run on
delay
Pump start
delay
Common relay
allocation
Common relay
operation
Run time limit
Test menu
RS485
MODBUS
setting
Push to test
pump
Passcode
change
System fill
volume
Pump activity
log
Pump run time
log
Power
interrupt log
Alarm log
Controller info
display
Fig . 22
17 Oct 2019
Home screen
System
Enter pass
pressure
code
display
(If set)
Error display
System fill
status display
Pump activity
display
Pump run time
display
Alarm reset
Setting menu
`
Advanced
menu
Test menu
Set system
Setting menu
pressure
Set differential
pressure
Set Hi alarm
Set Lo alarm
System Fill
Star Activity
High
- 22 -
6 .25 Common alarm relay set-up:
The common alarm relay, (relay 3, Fig .25) can be configured via the Advanced setting
menu to activate when one of the following alarms are displayed on the screen:
Hi pressure
Pressure above the Hi pressure alarm (1)
Lo pressure
Pressure below the Lo pressure alarm (4)
Low water level
Low water level is seen by the sensor in the tank .
Pump fail
A system pressure increase is not acheived in a 5 minute period .
A pump has run for longer than the set Pump run time value, 10 to 60
Pump run time high
minutes without stopping .
Pump activity high
A pump has started more than the Start Activity high value in 24 hours .
Sensor fail
The sensor input is above or below the normal input range .
This will allow remote monitoring of an alarm to help fault find or monitor the
system condition . The Common alarm relay can also be configured via the Advanced
setting menu to be open circuit (NO) or closed circuit (NC) when the alarm is active
allowing the output signal to be changed .
6 .26 Hydraulic commissioning:
Ensure both inlet and outlet hydraulic connections are made using the
z
supplied rubber sealing washer and are watertight .
Turn on water supply to APU – Check for leakage and operation of fill
z
valve .
Allow the tank to fill and water level to stabilise . Adjust the float of the
z
fill valve to set the water level if needed .
Bleed pumps by undoing the slot
z
head bleed screw on the pump body
by ½ a turn until water can be seen to
flow out . Nip up, do not over
tighten .
Close isolation valve on the outlet of
z
the APU .
Turn the electrical supply ON to the
z
APU . The ADEY start up logo will be
displayed and then the Home screen will
be displayed .
The APU will run briefly and then turn off after a pre-set run on time .
z
Due to the small size of the isolated system the APU will signal a Hi
pressure error and the red error light will illuminate on the front of the
APU, this is normal .
Open the isolation valve on the outlet of the APU and the APU will
z
run and start to fill the system .
6 .27 For further technical support: Phone the ADEY Customer Services team on
+44 (0) 1242 546 717 . Our staff are trained to help and advise you over the phone .
Fig. 23
- 23 -