Centrometal EKO-CK P 50 기술 지침 - 페이지 4

{카테고리_이름} Centrometal EKO-CK P 50에 대한 기술 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Centrometal EKO-CK P 50 20 페이지. Hot water boiler

General, boiler description, delivery, additional equipment
1.0. GENERAL
The boiler EKO-CK P has a modern construction and design and is made out of the
controlled materials of high quality, welded with most modern technology and is approved and
tested under EN 303 - 5 norm and fulfil all special request for the connection on the installation of a
central heating system.

1.1. BOILER DESCRIPTION

The boiler EKO-CK P is steel hot water boiler. The combustion chamber has a large heating
surface and low combustion chamber resistance. Boiler cleaning is very simple and it is possible to
clean it from the front side.

1.2. DELIVERY STATE

The boiler with boiler door is delivered on a wooden pallet, with turbulators in combustion
chamber, cleaning accessoris (poker, scraper and holder for cleaning accssories) and set (sheet
metal screws, screws and plug).
1.3. OBLIGATORY ADDITIONAL EQUIPMENT OF THE BOILER EKO-CK P
FOR WOODEN PELLETS FIRING
1. For boilers: EKO-CK P 20
- pellet burner CPPL-14 digital boiler control unit CPREG for pellet burner
CPPL-14
- pellet tank CPSP
- pellet feeder CPPT
2. For boilers: EKO-CK P 25, EKO-CK P 30, EKO-CK P 35 and EKO-CK P 40
- pellet burner CPPL-35, digital boiler control unit CPREG for pellet burner
CPPL-35
- pellet tank CPSP
- pellet feeder CPPT
3. For boilers: EKO-CK P 50 and EKO-CK P 60
- pellet burner CPPL-50, digital boiler control unit CPREG for pellet burner
CPPL-50
- pellet tank CPSP
- pellet feeder CPPT-50
4
Technical instructions EKO-CK P