Gamko X/MU 매뉴얼 - 페이지 5

{카테고리_이름} Gamko X/MU에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gamko X/MU 13 페이지.

22
X/VS20
Recommended order: First segment
left of X/VS and endpanels
place sealing tape
between X/EP and segment
1
th
2
nd
1
A
2
3
4
Couple segments
Turn hexagon key (6mm) on all 4 hooks, clockwise on
outside, counter-clockwise from inside segment
2-way action: I hook (make sure they "hook" properly)
II pull (max. 4 "clicks")
25 X/VS20
Connect trafobox
Click conenctors in bracket
DETAIL A
23
X/VS20
I
II
1
2
th
nd
1
th
when equipped with electrical accessoires
(such as LED, CELS or heating wire)
Lead wires through cable duct and down behind the
machinefront
26 X/VS20
24V
CELS
Plug in connectors for LED in the bracket
(Plug in connector for DMX in trafobox)
Plug in connectors for CELS and 24V in the
junctionbox behind the machinefront
Lead cables through hole
1 Cut insulation and place grommet
2 For LED: place bracket (provided with trafobox)
3 Place trafobox and lead cables through grommet
4 Seal hole
Neatly tie up all excess cables
Check if all accessoires are working properly
(DMX)
LED
name
Algemene installatie instructie
destination
Flexbar
1
1
02/09 DMX + CELS
02/09 DMX + CELS
24
X/VS20
230460A
2
4
006040403
1
3b
27
X/VS20
drawing nr.
196169
5611
5611
Blad 5 van 13
draftsman
date
edda
X/VS20
3a
Gamko Holding BV
Mon Plaisir 75
GB
4879 AL Etten-Leur
Tel.(0)76-5087500
The Netherlands
21-1-2009